HVAC for construction projects

Air conditioning for new sites

Design, delivery and installation of air conditioning systems already at the construction stage.

Complete HVAC solutions for residential complexes, apartments, hotels, villas and commercial properties.

SEND YOUR PROJECT (DWG/PDF)
Hero Image

HISTORY AND EXPERTISE

23+ YEARS

Market authority in Bulgaria.

SCALE

20,000+

Real installations of air conditioning systems in residential and commercial properties.

SCOPE AND SOLUTIONS

END TO END

Concept - Design - Delivery - Installation - ACT 16 - Maintenance.

IN-HOUSE SERVICE

100% GUARANTEE

A permanent operational base in Nessebar Fort Residence.

Engineering Risk Analysis

Why HVAC is planned during construction, not after plastering?

Air conditioning is not just a device for a wall. It is a critical installation that determines the energy class, the facade aesthetics and hassle-free commissioning (Act 16).

01

Architectural design

02Critical

HVAC installations

Key stage
03Critical

Rough construction

Route laying
04

Finishing works

05

Furnishing

06

Completed site

PROPER PLANNING WITH NESSEBAR KLIMA

No compromise

Hidden routes:

the piping and condensate are laid into the screeds and shafts without visible cable channels.

Precise sizing:

capacity based on room volume and heat loss, without energy waste.

Organised drainage:

gravity discharge with no risk of dripping facades and damaged plaster.

Prepared power supply:

correct cable cross-sections and breakers in the main panel.

Clean installation:

indoor units are mounted after the clean construction activities.

Predictable budget:

fixed delivery and installation prices without unexpected adjustments.

LATE PLANNING AND ITS CONSEQUENCES

+30% costs

Chasing finished walls:

destruction of already completed plaster, insulation and paint.

Additional costs:

paying for repeated construction and repair work to restore the site.

Visible external services:

aesthetic PVC channels and pipes hanging loose on the facade.

Architectural limitations:

impossibility to install the optimal type of indoor unit.

Deadline delays:

halting of final finishing works due to routing.

Energy efficiency compromises:

overloading of the building general electrical grid.

Hero Image

METHODOLOGY & CONTROL

One partner for the entire air conditioning system

From the concept drawing to daily warranty service — full engineering responsibility without passing blame between designers and installers

01

Project Analysis

Familiarization with architectural plans, thermal insulation layers, facade geometry, and customer requirements.

02

Measurement and Heat Loss

Precise engineering calculations of volumes, orientation, heat gains, and thermodynamic coefficients for each room.

03

System Selection

Determining the exact technology: centralized VRF/VRV systems, multi-split systems, or high-efficiency heat pumps.

04

Detailed Design

Coordinating precise cable, pipe, and gravity drainage routes with structural engineers, electrical engineers, and plumbers.

05

Equipment Delivery

Direct logistics from the warehouses of official suppliers (Daikin, Mitsubishi, Gree) synchronized with the construction schedule.

06

Site Preparation

Laying routes, seamless copper pipes with Armaflex insulation, and automation during the rough construction phase before screeds.

07

Specialized Installation

Installation of outdoor units, convectors, channel bodies, linear diffusers, and BMS controllers by experienced certified technicians.

08

Commissioning and Setup

Deep vacuum, high-pressure nitrogen tests, flow meter calibration, and programming of intelligent management.

09

Warranty Service

Continuous regional technical support, seasonal maintenance, and full stock of original spare parts on-site.

TECHNICAL TYPOLOGIES

A solution for every site

Specific thermodynamic schemes tailored to the architectural style, cooling load and investment budget.

sys 01
INDIVIDUAL ZONES

SPLIT / MULTISPLIT

For apartments, single-family houses and smaller standalone sites. One outdoor unit serves up to 5 independent indoor units.

Low operating costs
Flexible phased installation
Class A+++ seasonal efficiency
sys 02
BUILDING SCALE

VRF / VRV SYSTEMS

For residential complexes, hotels, office centres and large buildings. Simultaneous heating and cooling with long piping runs up to 1000 m.

Centralised microprocessor control
Modular expansion principle
Accurate energy consumption metering
sys 03
ARCHITECTURAL AESTHETICS

DUCTED SYSTEMS

For maximum architectural cleanliness and concealed installation in suspended ceilings. Only designer linear air grilles remain visible.

100% discreteness in the interior
Even air distribution
Minimal noise level
sys 04
RES & ENERGY EFFICIENCY

HEAT PUMPS

Heating, cooling and year-round domestic hot water (DHW). Integration with water underfloor heating and fan coils for the next generation of buildings.

Up to 75% energy drawn from the environment
Full replacement of conventional radiators
High COP coefficient up to 5.1

Selected references

Completed projects

Completed air-conditioning projects for residential, resort and hotel complexes across the Southern Black Sea coast.

Location
16 projects
Completed works
Nessebar · Seafront

Mass air conditioning of apartments in a modern residential complex on the seafront in Nessebar.

Installed equipment
DaikinSplit
—
Floors
6
Position
Seafront
Completed works
Nessebar

Mass installation of air-conditioning systems in the apartments of Valencia Lux.

Installed equipment
—Split
—
Floors
6
Location
Nessebar
Completed works
Sunny Beach · Multiple buildings

Mass air conditioning of apartments across several buildings of Harmony Suites Grand Resort.

Installed equipment
—Split
—
Buildings
11 / 12 / 15 / 16
Area
≈ 8,500 m²
Completed works
88 apartments

Mass installation of air-conditioning systems across 88 apartments at Harmony Suites 18.

Installed equipment
—Split
—
Apartments
88
Floors
6
Completed works
Premium

Mass air conditioning of apartments at Harmony Suites Premium.

Installed equipment
—Split
—
Type
Premium complex
Location
Sunny Beach
Completed works
Fort Noks

Mass air conditioning of apartments at the new Green Fort Suites development.

Installed equipment
—Split
—
Developer
Fort Noks
Location
Sunny Beach

Building segment

BUILDING AND CONSTRUCTION TYPES

Specialised engineering teams for every scale — from single-home interiors to multi-family mega complexes

RESIDENTIAL COMPLEXES

Centralised VRF installations with individual consumption metering and optimised facade space

VILLAS AND HOUSES

Premium air-to-water heat pumps with fan coils and underfloor heating for 100% year-round microclimate comfort.

HOTELS AND RESORTS

Reliable systems for peak loads during the summer season, low noise levels and central control from reception.

LUXURY APARTMENTS

Ducted and concealed ceiling installations with routes embedded in the walls, no protruding cables and no visible outdoor units.

OFFICE BUILDINGS

Zoned microclimate, CO₂ sensors and ventilation integration for maximum productivity and standards compliance.

RETAIL PREMISES

Air curtains, powerful cassette units and high-pressure ducted machines for spaces with high footfall.

B2B benefits

WHY BUILDERS CHOOSE NESSEBAR KLIMA

We are not an ordinary retail store. We are an engineering structure with our own service team, experienced personnel and guaranteed stock availability.

01

REAL SITE EXPERIENCE

We know the real problems of construction — dust, schedules, crews overlapping and the need for flexibility

02

INTEGRATED APPROACH

No passing of responsibility between the designer and the installer. One party is accountable for the correct operation of the whole system.

03

PRECISE SIZING

We calculate heat losses so that the air conditioner does not run at maximum power in winter or freeze in humidity by the sea.

04

DEADLINE COMPLIANCE

We coordinate directly with the site technical manager so the routes are laid just before plastering and screeding.

05

GLOBAL MANUFACTURERS

Direct supply of Daikin, Mitsubishi Electric, Fujitsu, Gree equipment with full factory certification and origin.

06

LOCAL SERVICE IN THE REGION

Based in Nessebar, we are 15 minutes from every site on the southern Black Sea coast whenever service or a response is needed.

Customer reviews

What our customers say about us

Extremely satisfied with the speed. They installed the air conditioner on the agreed day without delay. Everything was clean and tidy.

I

Ivan Dimitrov

Nessebar

I would like to express my gratitude to your company for the excellent service! We contacted you to arrange maintenance for our two air conditioners. Our request was handled promptly, and the technicians arrived the very next day. We were informed of the appointment time in advance. Everything was well-organized, efficient, and professional. The prices were also very reasonable. Thank you very much! We will definitely recommend your company to our friends and acquaintances!

Natalia Veit

Nesebar

Good communication at all stages, they responded quickly, made quick decisions and were always in touch. Great price offers! The installation of air conditioners was completed within the agreed time frame. I recommend it!

L

Lana N

Nesebar

Area of operation

We respond quickly across the whole region

Our mobile teams are based in Nessebar, which allows us to serve any request on the southern Black Sea coast without unnecessary transport costs.

Nessebar
Sunny Beach
Sveti Vlas
Ravda
Elenite
Burgas
Aheloy
Pomorie
Burgas region

Questions and answers

Frequently asked questions about air conditioning equipment

Hero Image

PLAN THE AIR CONDITIONING RIGHT FROM THE START.

A better project. A cleaner installation. Fewer unforeseen costs during construction.

Contact us